Archinect

UCLA (A Center for Ants?)

  • anchor

    24 hours til final review...

    By A Center for Ants?
    Dec 11, '06 11:15 PM EST


    My name is A Center for Ants, I'm an architecture student. And this is the longest day of my life.

    Designing is done. I don't have time to resolve the little things that are bothering me. I have to let it go. Fussing has already put me behind schedule. Hopefully my studio instructor isn't reading this and freaking out.

    I've decided on focusing on producing some nice drawings as opposed to a nice model. I really wanted to do a nice model, but i think at this point in time, it's not a reality that I can achieve.

    Took a five minute nap on the desk and I'm ready to go. Though eating "chinese" fast food was NOT the wisest decision.


     
    • 11 Comments

    • sharpie.

      good luck dude

      Dec 12, 06 2:51 am  · 
       · 
      myriam

      20- 20- 24 HOURS TO GO-OH-OH...

      Dec 12, 06 3:05 am  · 
       · 
      myriam

      GOOOOOOD LUCK!

      Dec 12, 06 3:06 am  · 
       · 
      Louisville Architect

      is this day going to stretch through the winter months? will you leave us hanging at the most suspenseful moments? how many times will you almost die and leave a gaggle of casualties in your wake? you're my favorite show, man.

      Dec 12, 06 6:11 am  · 
       · 
      Liebchen

      He may ask us a question in a whisper, then when we either can't hear him, or can't understand him, he'll raise is gun and ask us again. Only this time he'll scream it in our face.

      Dec 12, 06 7:55 am  · 
       · 
      A Center for Ants?

      episode 1:
      3 am to 4 am
      laser cutter mayhem. the sign up sheet got screwed when someone jumped on when they weren't supposed to!!! i was diverted to laser cutter B, but other students were moving in. my sheet of plastic was still in the cutter. would i be able to finish cutting? or would i get the cold boot?

      Dec 12, 06 7:58 am  · 
       · 
      A Center for Ants?

      the following takes place betwen 4 and 5 am on the day of the final project due date:

      cutting the foam via xacto... not exactly stoked on the quality of finish, but then again, i knew my model was going to be less than.

      do i cut all the surfaces as planned? or do i just move on to what's feasible?

      Dec 12, 06 8:00 am  · 
       · 
      AP

      good luck ACfA.

      Dec 12, 06 11:35 am  · 
       · 
      dusty

      good luck andrew!! we have one more week... or 5 days now... they all blend together.
      -lucia

      Dec 12, 06 12:17 pm  · 
       · 
      A Center for Ants?

      the following takes place between 9 am and 10 am...

      slightly high on acrylic solvent/cement, neighboring zip kicker is not helping... stomach is freaking out from eating poorly.

      double espresso is doing it's job. everyone in studio is getting nervously bitchy and anxious.

      Dec 12, 06 12:52 pm  · 
       · 
      broccolijet

      should it come to this, when all else fails...finger-pistols!!!!

      good luck

      Dec 12, 06 4:16 pm  · 
       · 

      Block this user


      Are you sure you want to block this user and hide all related comments throughout the site?

      Archinect


      This is your first comment on Archinect. Your comment will be visible once approved.

    • Back to Entry List...
  • ×Search in:
 

Affiliated with:

Authored by:

  • A Center for Ants?

Other blogs affiliated with University of California, Los Angeles (UCLA):

Recent Entries