Shenzhen Pengfeng Building
Design Unit: KPF
Developer: Shenzhen Pengfeng Group
Production cycle: 28 days
Due to the limited space that was available in the place that the model was meant to be displayed in, we made use of the drawer design to showcase the basement parking area of the building.
Status: Unbuilt