H2L2 (Built, photos from construction on http://www.behance.net/gallery/Escuela-Campo-Alegre/2518345 ) Caracas Venezuela, Escuela Campo Allegre (American School of Caracas) 2008

This was a project of a Gymnasium and Early Childhood Center designed at H2L2 Architects in 2008. Due to a small, hilly site the new Gym and Early Childhood Center had to be located under the football field. The main entrance was leading to the 3 story high atrium area dividing the Early Childhood Center and the main entry to the Gym. Locker rooms and storage areas are located at the back of the Gym. Adjacent to Early Childhood Center is an outdoor playground area. The 50 meters by 100 meters football field with bleachers are located on the roof of the building which is connected by stair and elevators to the campus main walkway. See photos from construction on http://www.behance.net/gallery/Escuela-Campo-Alegre/2518345
 

 
Read more

Status: Built
Location: Caracas, VE
My Role: Architect designer
Additional Credits: Partner in charge: Douglas Steele
Project Manager: David Knapp
Initial presentation: Joanne Pizzo

 
Sketch, Bird's Eye View
Sketch, Bird's Eye View
Sketches, Elevation Study
Sketches, Elevation Study
Site Plan
Site Plan
Lower Level Floor Plan
Lower Level Floor Plan
1st Floor Plan
1st Floor Plan
2nd Floor Plan
2nd Floor Plan
Field level and Roof Plan
Field level and Roof Plan
Satelite view of completed bldg.
Satelite view of completed bldg.
Building Elevations
Building Elevations
Building Sections and Interior Elevations
Building Sections and Interior Elevations
Building Sections
Building Sections
Gym under construction, view from gallery above entrance
Gym under construction, view from gallery above entrance
Gym under construction, South wall
Gym under construction, South wall
Building Sections and Interior Elevations, bottom section shows west wall elev.
Building Sections and Interior Elevations, bottom section shows west wall elev.
Gym under construction, west wall elevation
Gym under construction, west wall elevation
Gym under construction, west wall elevation
Gym under construction, west wall elevation
Details, Enlarged Plans, Elevations and Sections
Details, Enlarged Plans, Elevations and Sections
Bleachers - Details, Enlarged Plans, Elevations and Sections
Bleachers - Details, Enlarged Plans, Elevations and Sections
Bleachers under construction
Bleachers under construction
Synthetic Rooftop AirDrain System was applied
Synthetic Rooftop AirDrain System was applied