Project consists of two elements a) removing a 1954 addition to Harriman Hall creating a new Forum space with larger classrooms, new lecture halls and renovating the existing Harriman Hall building thus improving accessibility and an existing facility that had outgrown the current building’s capacity & b) working with Design Architects on the Design/ Construction of a new OLIN Art Gallery connected to the west side of Harriman Hall.
My involvement consisted of developing drawings from Schematic Design to 100% Design Development Documents. Construction Documents are currently been completed for bidding.
Status: Unbuilt
Location: Middletown, CT, US
My Role: My involvement consisted of developing drawings from Schematic Design to 100% Design Development Documents. Construction Documents are currently been completed for bidding.