A cable-stayed bridge over the Ziegelgraben, is the landmark structure of the 2nd Strelasund crossing. It should be completed by 2007 (via Hebig.com ) // more>
"The most significant structure is the cable-stayed bridge over the Ziegelgraben (length 580m, maximum span length 198m, clearance height 42m, pylon height 126m). Both sides connect to the foreshore bridges Stralsund (645m) and Dänholm (530m) as well as the constructions across the Strelasund (1,070m).
During the construction phase, 58,400 cubic metres of concrete and 15,480 tons of steel. The road sections on the cable-stayed bridges will be assembled by floating cranes".
The construction work for the second Strelasund crossing will be carried out by the companies WALTER BAU-AG - DYWIDAG and Max Bögl GmbH & Co. Walter Bau is behind the renovation of Berlin's Olympic Stadium and the Frauenkirche in Dresden.
No Comments
Block this user
Are you sure you want to block this user and hide all related comments throughout the site?
Archinect
This is your first comment on Archinect. Your comment will be visible once approved.