Archinect
Nathan A. Hayes

Nathan A. Hayes

Frederick, MD, USA

anchor
(Image Credit: KlingStubbins)
(Image Credit: KlingStubbins)
1 more images  ↓

Cordis Building 3, West Coast Campus

The Cordis West Coast Consolidation project consisted of the construction of a 10,000 ft2 (929 m2) ISO8 cleanroom facility. The project featured the design of a new research and development wet/ dry laboratory space. Further support spaces and specialty rooms complete the project, all with life science designation standards. This is a heavily engineered project, with a focus on mechanical, electrical/controls, and process/plumbing systems.

As an Engineering Draftsman on a campus consolidation of several existing buildings, Nathan supported Plumbing Engineers and Project Managers throughout Design Development and Construction Documentation.

 
Read more

Status: Built
Location: San Francisco, CA, US
My Role: Engineering Draftsman
Additional Credits: KlingStubbins - MEP Engineering

 
(Image Credit: KlingStubbins)
(Image Credit: KlingStubbins)