Continuing DFA’s collaboration with DWR, I worked on two projects for the brand. My work for La Jolla was limited to early schematic design and some CD detailing. For Charlotte I completed and assembled the CD package, including the design of some millwork elements like slatted ceilings and walls, and did CA, including site visits in early phases of construction.
Status: Built
Location: Charlotte, NC, US
My Role: Construction Documents, Construction Administration
Additional Credits: This work was done as an employee of DFA.