    We have been working hard on our current casting project. You can chart our progress on our blog here:
    http://amphorae.wordpress.com/



    With the engineer Peter Calcetas arriving in a week we have set up a series of smaller quick molds that we can use to test Ductal. This unit will be used as a tabletop planter containing one cistern and one planter. It is slightly over two feet long and 7″ wide. The thickness of the unit is approximately 3/4″ and will have three pour holes on the bottom.

     

     