Archinect
Krzysztof Koryzno Architekt

Krzysztof Koryzno Architekt

Barczewo, PL

anchor
The entrance from the existing building side
The entrance from the existing building side
4 more images  ↓

Development concept of the integration node in Gdańsk

Technical parameters of the building:

Total area:                                                                3015.0 m²
Building area:                                                          480.3 m²
Biologically active area:                                         505.4 m²

Building area of the new buiding:                        327.9 m²
Total area of the new building:                             631.1 m²

 
Read more

Status: Built

 
View from the bus stop
View from the bus stop
Space between new and existing building
Space between new and existing building
View of the roofing for temporary retail space
View of the roofing for temporary retail space
View of the shopping street
View of the shopping street