This will be my first project working with AIA doc B104 for a small spec development project and need to know more about cost estimating so I can accurately convey my responsibilities to the client.
We are finishing up the pre-design phase of a design-build project and have a contractor on board that will take my schematic package and provide the cost estimating, relieving me from responsibility of producing this information. This seems like a great help!
But, before I give away my responsibilities (according to the AIA) I want to understand the implications. What are the issues to consider? Do we as architects want the responsibility/control? or would we rather it fall to some else?
May 27, 15 5:06 pm
Block this user
Are you sure you want to block this user and hide all related comments throughout the site?
Archinect
This is your first comment on Archinect. Your comment will be visible once approved.
Design-Build Cost Estimation
This will be my first project working with AIA doc B104 for a small spec development project and need to know more about cost estimating so I can accurately convey my responsibilities to the client.
We are finishing up the pre-design phase of a design-build project and have a contractor on board that will take my schematic package and provide the cost estimating, relieving me from responsibility of producing this information. This seems like a great help!
But, before I give away my responsibilities (according to the AIA) I want to understand the implications. What are the issues to consider? Do we as architects want the responsibility/control? or would we rather it fall to some else?