The construction will take place holistically at once. Except for our athletic facility, whose timeline is little bit later. And there is all the landscaping work that will commence once the construction is further along. The vision of what the center will be is firmly understood. The drawings are complete and ready to be executed upon. The concrete work will be the next phase. People will begin to see the construction coming out of the ground beginning in the summer. — ARTnews
Bernard told ARTnews she wants the 19-acre TWBTA-designed library and parks complex to “serve as an example” for other developments in the city. The Director also described the museum's four-floor gallery layout, which is topped by a "Sky Room" feature in addition to a 5,000-square-foot special exhibits gallery located on the building's lowest level. When discussing the space she shared, "we will delve into topics that we only touch upon in the core exhibit.”
The museum will also include a replica of the oval office, and core galleries consisting of mostly donated objects filtered through the focal point of the historic 2008 Presidential election, with the curatorial direction being “not just to be about him but about the people who made his presidency possible.”
No Comments
Block this user
Are you sure you want to block this user and hide all related comments throughout the site?
Archinect
This is your first comment on Archinect. Your comment will be visible once approved.