The library, which opened in 1980, has been undergoing needed interior repairs and upgrades since last summer. But changing Breuer’s historic facade has been a point of contention since architecture firm Cooper Carry proposed cutting holes into the building to make way for the windows. — Curbed Atlanta
After an Atlanta-Fulton Public Library System survey found that 72 percent of participants "were interested in seeing more windows added to the building," it was insisted to become a reality. Naturally, with such an iconic building, there was cause for concern. The renovations are estimated to conclude "by September 2020 at the earliest."
No Comments
Block this user
Are you sure you want to block this user and hide all related comments throughout the site?
Archinect
This is your first comment on Archinect. Your comment will be visible once approved.