The baptismal font is located on the north side of the church adjacent to the Bible study/meeting room and bathrooms on the first floor. The font consists of an opening in the slab, including concrete steps into a pool of water with a total depth of over 3’. The font loads were supported by steel beams which were hung from the steel beam supports on the first floor at one end and the structural concrete wall on the other end. Due to the large span between beams supporting the font, a stronger steel deck (2 inch LOK-Floor 16-gage with 3.5” of concrete cover) had to be used. Worst case loads were assumed for the font in order to be conservative. The load calculations and beams designs are shown in Appendix K.