    Preparing the foundation for concrete pouring

    By Jessica Hulme
    Nov 18, '14 12:54 AM EST

    On top of the gravel we laid a DPM plastic which was to go below the polystyrene sheets. We had to run to collect concrete blocks and block cut-offs to hold down the DPM from waving around and flying away in the wind before laying the polystyrene with blocks on top too.

    Next we bent the D12 steel reinforcing rods down, as well as cutting and bending new D12 rods that would act as perimeter rods. On top of the bars we laid the steel mesh on top, and cut to size for the flooring. We then tied it all together using steel ties and nibs.



     
    • No Comments

    • Block this user


      Are you sure you want to block this user and hide all related comments throughout the site?

      Archinect


      This is your first comment on Archinect. Your comment will be visible once approved.

    • Back to Entry List...
  • ×Search in:
 

About this Blog

Studio 19 is a collaboration between UNITEC and Strachan Group Architects (SGA). Third year architecture students are given the opportunity to work along side SGA to design, document and build a project. The Brief from Ngāti Whātua O Ōrākei was to design of a master plan of eight houses for elderly tribe members. One of these houses is to be documented and built by the students.

Authored by:

  • Rory
  • Jessica Hulme

Recent Entries