Apr '14 - Nov '14
On top of the gravel we laid a DPM plastic which was to go below the polystyrene sheets. We had to run to collect concrete blocks and block cut-offs to hold down the DPM from waving around and flying away in the wind before laying the polystyrene with blocks on top too.Next we bent the D12 steel... View full entry
For the past few weeks the team has been working on the exterior cladding of the house. This has involved cutting, routing, priming, painting, putting the flashings in place and nailing. Accuracy and keeping the walls in square is key to the house being able to fit together properly when we... View full entry
The concrete truck was coming early so the boys had an even earlier start to the day - everyone in a rush to get the precast construction ready for pouring.They had constructed a temporary roof that will cover the concrete while it is drying. This is to protect it from Auckland's schizophrenic... View full entry
A 5am start before sunrise, we all met up at Orakei on site for a traditional Maori blessing of the land where we would eventually assemble our house.At sunrise we all met up again to begin working on setting up string lines, preparing the excavation lines for digging. View full entry
Studio 19 is a collaboration between UNITEC and Strachan Group Architects (SGA). Third year architecture students are given the opportunity to work along side SGA to design, document and build a project. The Brief from Ngāti Whātua O Ōrākei was to design of a master plan of eight houses for elderly tribe members. One of these houses is to be documented and built by the students.