    Pouring concrete for the precast slab

    By Jessica Hulme
    Oct 17, '14 5:24 PM EST

    The concrete truck was coming early so the boys had an even earlier start to the day - everyone in a rush to get the precast construction ready for pouring.

    They had constructed a temporary roof that will cover the concrete while it is drying. This is to protect it from Auckland's schizophrenic elements, today it was too much sun.

    Everyone was hands-on during the pouring, and when it started to calm down and needed less people, the girls and the interior team started to work on the concrete bench for the build and pavers from the leftover concrete.



     
    • No Comments

    • Block this user


      Are you sure you want to block this user and hide all related comments throughout the site?

      Archinect


      This is your first comment on Archinect. Your comment will be visible once approved.

    • Back to Entry List...
  • ×Search in:
 

About this Blog

Studio 19 is a collaboration between UNITEC and Strachan Group Architects (SGA). Third year architecture students are given the opportunity to work along side SGA to design, document and build a project. The Brief from Ngāti Whātua O Ōrākei was to design of a master plan of eight houses for elderly tribe members. One of these houses is to be documented and built by the students.

Authored by:

  • Rory
  • Jessica Hulme

Recent Entries