Apr '14 - Nov '14
On top of the gravel we laid a DPM plastic which was to go below the polystyrene sheets. We had to run to collect concrete blocks and block cut-offs to hold down the DPM from waving around and flying away in the wind before laying the polystyrene with blocks on top too.Next we bent the D12 steel... View full entry
Lastly the truck brought in a finer metal aggregate which would we had about a 50mm layer of, which was compacted to 50mm from the top (approximated from a 45 x 90 timber block placed flat on the perimeter of the floor). We then spread the aggregate evenly to compact and level. View full entry
Preparing the foundations for concrete pouring, the gravel needed to be poured on in layers and then compacted. This continued until the gravel was compacted and leveled to about 75mm from the top of the concrete block footings. View full entry
While we were working on the prefabrication of the build at the workshop at Unitec, on site excavation and the footings were being put down. When we turned up it was ready for us to prepare for concrete pouring. First we started with clean up and disassembling the stringline timber boundary... View full entry
Studio 19 is a collaboration between UNITEC and Strachan Group Architects (SGA). Third year architecture students are given the opportunity to work along side SGA to design, document and build a project. The Brief from Ngāti Whātua O Ōrākei was to design of a master plan of eight houses for elderly tribe members. One of these houses is to be documented and built by the students.