Location:
The Western Part of Vasilievsky Island, St-Petersburg
Project Year:2010
Construction Year:2011
Phase:built
Awards: Diploma of the review - competition of the architectural creations of 2009-2011 in the nomination «Constructions»: «Public & Industrial Buildings” for the project - «Marine Ferry terminal №3 included into the buildings and constructions complex of the Marine Passengers Terminal.
Authors:
S.Oreshkin – Project Manager
A. Melnikov – Project Chief Engineer
A.Nikandrov – Project Chief Architect
R.Andreeva, T.Kovalenko, Y, Piskun – Architects
V. Rovinsky – Chief Design-engineer
S.Oreshkin: “Within the design process of one of the biggest marine ports in Europe we suggested the building form as a twisted roll. However, due to some amendments the terminal turned into the module object with brightly expressed tech-design.
The Marine passengers terminal includes buildings of the ferry and cruise terminals which are connected by the overground staircases located on the second floor. Laconic Marine terminal facades form big glazed surfaces. The main compositional accents are slope canopies and columns located below. Volumetric and space scheme of the supportive terminal buildings is designed more laconic. The architects used alternation of the solid and glazed surfaces and also - slight blocks’ volumes shift.
Buildings completed:
2008 –Buildings and constructions complex of the Marine Passengers Terminal. Passenger ship terminal №1 (cruise)
2008 – Buildings and constructions complex of the Marine Passengers Terminal. Port control; center
2009 – Buildings and constructions complex of the Marine Passengers Terminal. Passenger ship terminal №2 (cruise)
2011 – Buildings and constructions complex of the Marine Passengers Terminal. Passenger ship terminal №3 (ferry)
2011 – Buildings and constructions complex of the Marine Passengers Terminal. Passenger ship terminal №4
Status: Built
Location: The Western Part of Vasilievsky Island, St-Petersburg, Russia
Firm Role: Sergey Oreshkin - Project Manager