$5B / 1.1Msf Semiconductor Manufacturing Facility in Chandler, Ariz.
The new Arizona factory, designated Fab 42, is the most advanced, high-volume semiconductor manufacturing facility in the world. Construction is expected to be completed in 2013.
•Intel's Ocotillo manufacturing campus in Arizona received LEED silver certification for Existing Buildings: Operations & Maintenance.
•Intel is the first semiconductor or industrial technology company to obtain LEED certification for an entire manufacturing campus.
•A team of Intel employees determined a way to harness the carbon dioxide emitted by the Ocotillo manufacturing facility in order to grow algae for biofuel.
Status: Built
Location: Chandler, AZ, US
My Role: BIM Coordinator - Coordinate the fabrication and installation of P&ID systems via virtual construction model and BIM process.
Additional Credits: Intel Corp.
Hoffman General Contractors
Maverick Technologies