« back to Article

Pouring concrete for the precast slab

Dave Stachan from SGA keeping the cement from getting into the shower drain The truck has arrived! James Strachan moving the cement evenly around Waseem ready to screed and level concrete Sam and James using the screed to level the concrete James smoothing the surface of the concrete The 90mm side lip of the concrete slab foundation - the walls will connect to this A polished surface Constructing the temporary roof for the slab The girls working on the concrete bench