$30 million new Design-Bid-Build LEED silver certified
2-story 47,000 SF Type VB fully sprinklered building on 0.516 acre lot with 40-car subterranean garage with electric charging stations, 6 apparatus bays, 24-dorms, community room, kitchen, administration, fitness room, backup fuel tank and generator, solar panels.
Status: Built
Location: Santa Monica, CA, US
My Role: Construction Manager
Additional Credits: Architect: Rob Wellington Quigley, FAIA
Structural Engineer: Thornton Tomasetti