- Created a new academic building for engineer students at NC State.
- Challenge was to bridge the gap between EB.4 (background) and the new Hunt Library (Signature).
- Worked with studio and University Architects/Engineers to discuss possible designs.
- Resulted in a mediative building based on materiality of the two contextual buildings.
Skills used: Sketch Up, Photoshop, Illustrator, Podium, Wood Shop, Laser Cutter, Hand Cutting
Status: School Project
Location: Centennial Campus, Raleigh, NC
My Role: Architect