Each day, New York’s public garbage trucks collect nearly 7,000 tonnes of residential mixed solid waste. After finishing their routes, most of these trucks will deposit the garbage in one of New York’s waste transfer stations located throughout the city. From there, the garbage will eventually be loaded on to a barge or train and carried as far as 600 miles to its final stop. For most of New York’s mixed solid waste (about 80% of it by tonnage), this last stop will be a landfill. — the Guardian
"The remaining 20% will end up at a waste-to-energy plant, where it will be incinerated and converted into energy."
For more on the infrastructure of waste, follow these links:
No Comments
Block this user
Are you sure you want to block this user and hide all related comments throughout the site?
Archinect
This is your first comment on Archinect. Your comment will be visible once approved.