San Juan, PR
The Project consists of the development of an Infrastructure Master Plan for transportation, potable water, sanitary sewer, storm sewer, electrical distribution and telecommunications systems that will serve the future development of the former Roosevelt Roads Naval Base. An analysis of the existing conditions of the infrastructure systems was performed to propose improvements for each infrastructure system.
Some of the performed tasks include:
Read more http://bit.ly/1GwaPNM
Status: Built
Location: Ceiba, PR, US
Firm Role: Infrastructure / Master Planning / Civil Engineering