    Framing almost complete

    By Rory
    Oct 6, '14 4:52 AM EST

    With only a few wall frames left to complete we are almost done with the first step of the prefabrication process. Next we will move onto fixing rab board to the frames which will replace building paper. This is to ensure each wall panel is braced while being transported to site and erected. We started building platforms which we could work on so as to have a level workbench for the cladding process.



     
    • No Comments

    • Block this user


      Are you sure you want to block this user and hide all related comments throughout the site?

      Archinect


      This is your first comment on Archinect. Your comment will be visible once approved.

    • Back to Entry List...
  • ×Search in:
 

About this Blog

Studio 19 is a collaboration between UNITEC and Strachan Group Architects (SGA). Third year architecture students are given the opportunity to work along side SGA to design, document and build a project. The Brief from Ngāti Whātua O Ōrākei was to design of a master plan of eight houses for elderly tribe members. One of these houses is to be documented and built by the students.

Authored by:

  • Rory
  • Jessica Hulme

Recent Entries