Archinect
Anurag Gautam

Anurag Gautam

London, GB

anchor

WATERLOO INTERNATIONAL TERMINAL - RETAIL Phase - London - Infrastructure January 2017 - Present

- Co-ordinating the Grip 4 Retail BOH Loading Bay for Service Vehicles to serve the Proposed Retail Units, 

- Liasing with manufacturers for fabrication and suitability for possible deisgn selection for Enclosure Buildup, 

- Specification co-ordination and Strategy for Retail and Operations Phase Unification, 

- Creating the Technical Report for Operations Phase Materials Palette, 

- Operations Materials Palette Co-ordination for client sign off, 

- Developing conceptual works for the Grip 4 FOH New Ceilings within the Retail Mall Area., 

- Carrying out site survey to identify the visual risks / requirements for further investigation of the Dual Use Service Corridor, 

- Writing the Advanced BOH Study Report for Client and sub-contractors Approval, 

- Co-ordinating the BOH Service Corridor with design disciplines including: Fire Engineering, Structural Engineering, Mechanical Engi-neering, 

- Developing Risk Mitigaition Strategies for the potential Risks / MEP clashes, 

- Recommendation for the suitable strategy to minimise potential construction costs prior to fabrication,

 
Read more

Status: Built
Location: London, GB
My Role: Back of House Design/Construction Co-ordinator
Additional Credits: Aecom,
Weston Williamson