- Co-ordinating the Grip 4 Retail BOH Loading Bay for Service Vehicles to serve the Proposed Retail Units,
- Liasing with manufacturers for fabrication and suitability for possible deisgn selection for Enclosure Buildup,
- Specification co-ordination and Strategy for Retail and Operations Phase Unification,
- Creating the Technical Report for Operations Phase Materials Palette,
- Operations Materials Palette Co-ordination for client sign off,
- Developing conceptual works for the Grip 4 FOH New Ceilings within the Retail Mall Area.,
- Carrying out site survey to identify the visual risks / requirements for further investigation of the Dual Use Service Corridor,
- Writing the Advanced BOH Study Report for Client and sub-contractors Approval,
- Co-ordinating the BOH Service Corridor with design disciplines including: Fire Engineering, Structural Engineering, Mechanical Engi-neering,
- Developing Risk Mitigaition Strategies for the potential Risks / MEP clashes,
- Recommendation for the suitable strategy to minimise potential construction costs prior to fabrication,
Status: Built
Location: London, GB
My Role: Back of House Design/Construction Co-ordinator
Additional Credits: Aecom,
Weston Williamson