As Chief Architect and Chief Deputy City Engineer presiding over a group of 800+ architects and engineers, Deborah Weintraub has a big picture of LA infrastructure in mind when it comes to the river. She also has a fair amount of historical perspective, having overseen the implementation of the Los Angeles River Revitalization Master Plan after it first issued RFPs in December of 2004.
Additionally, she oversaw the design and construction of the river's new 6th Street Viaduct by Michael Maltzan's office, which recently broke ground.
Nicholas Korody spoke with Deborah about her role as the most senior architect in the Bureau of Engineering, the river's urbanistic potential (and pitfalls) as a gigantic piece of infrastructure, and Gehry's role beyond hydrology.
Listen to Archinect Sessions Mini-Session #4 of 'Next Up: The LA River' with Deborah Weintraub:
About Next Up: The LA River
When Frank Gehry's office was first attached to the L.A. River's master plan and redevelopment, the river began attracting fresh attention over a project that had already been evolving for decades. This October, in an attempt to do justice to the river's complexity and history (and the accompanying urbanist discourse), Archinect hosted 'Next Up: The LA River'—a live podcasting interview series with an array of architects, planners, artists, and journalists with varying perspectives on the subject.
We're now eager to share those conversations with everyone as eight Mini-Sessions, released as part of our Archinect Sessions podcast. Myself, Paul Petrunia and Nicholas Korody moderated the conversations, which took place at the Los Angeles Architecture + Design Museum on October 29, 2016. While we reached out to them, unfortunately no representatives from Gehry's office were able to take part.
No Comments
Block this user
Are you sure you want to block this user and hide all related comments throughout the site?
Archinect
This is your first comment on Archinect. Your comment will be visible once approved.