I've been working in a Construction office doing shop drawings. I recently took a great position at a huge architecture firm. I'm planning to leave my job but I want to continue producing shop drawings especially heading to a busy construction season and we all know how busy it gets before a new year. I am getting paid hourly and it sometimes takes me just 1 day to finish a set of Shops but i get paid for 38hrs. I'm looking to charge them more because I will no longer be in the office and this will save them a lot of money..
Basically how should I charge for sets of shop drawings?
Thank you wurdan freo. I've decided to charge a percentage of the total project cost. I saves them money. I make more money per project and makes it worthwhile to work extra hours after a 8-5 job.
Cost for Shop Drawings
Good Morning y'all,
I've been working in a Construction office doing shop drawings. I recently took a great position at a huge architecture firm. I'm planning to leave my job but I want to continue producing shop drawings especially heading to a busy construction season and we all know how busy it gets before a new year. I am getting paid hourly and it sometimes takes me just 1 day to finish a set of Shops but i get paid for 38hrs. I'm looking to charge them more because I will no longer be in the office and this will save them a lot of money..
Basically how should I charge for sets of shop drawings?
Lots of good threads on here about pricing. gwharton, quizzical usually have great input regarding pricing. do some searching.
http://archinect.com/forum/thread/40723000/pricing-exercise
http://archinect.com/forum/thread/73779182/building-survey-as-built-how-much-to-charge
http://archinect.com/forum/thread/73779182/building-survey-as-built-how-much-to-charge
http://archinect.com/forum/thread/25229990/contract-work-how-to-set-up-and-how-much
Thank you wurdan freo. I've decided to charge a percentage of the total project cost. I saves them money. I make more money per project and makes it worthwhile to work extra hours after a 8-5 job.
how much did you end up charging? or what was your percentage?
I am in the same situation right now and not sure what to charge.
Madonafarag,
Because of the size of the projects and the detailing needed I would charge them .5% to 1%.