I'm currently working on a mixed use project consists of 200,000 SF Data center (S2) and 68,000 SF of office (B), but I'm having difficulty understanding mixed-use occupancies and the area calculation. (508.3 and 508.4).

I thought that I need to follow the Separated Occupancy method since 508.4 requires a 1HR fire separation in between S2 and B occupancies.  Because the office portion is larger than 10% of the data center, I don't think auxiliary occupancy would work here.  

If there isn't any fire separations required in between occupancies, then is it possible to go with non-separated occupancies?  

I need to consider following factors (also client requests):

1. Construction type is IIIA, Fully Sprinklered

2. Data center - 212000 SF | 2 Levels | 42'

3. Office - 76800 SF | 5 levels | 72'

To calculate the area, I followed the method listed in 506.2.4 and 508.4.2, so I calculated area per level.  This is little tricky because  2 levels of the office floor are same height as 1 level of the data center.  

= [ (B Proposed area/B tabular Allowable area At) + (S2 Proposed Area/S2 tabular allowable areat) ] < 1

=12000/28500 + 106000/117000 = 0.91 < 1

I also used the sprinkler increase in two different areas (i'm not sure if this is ok).  As for B occupancy, I followed At under height increase (S), while I used 'SM' for S2 occupancy. 

I don't feel confident about the allowable area calculation and the steps I followed.  I would be really grateful if you can chime in and offer any insights and know-hows. 




 
Aug 13, 18 2:23 pm
poop876

Start with 506 first for the height and area limitations. I'm assuming this would be an unlimited area building?

Aug 13, 18 3:10 pm  · 
 · 
Stasis

It's type IIIA and I did start from 506 to learn that IIIA is the most lenient type I can use.  I can't go down below IIIA because of height, floor, area limit that the client wants. I don't think this building can qualify for the unlimited area building. The building consists of 2 levels of S2 and 5 levels of B.

Aug 13, 18 3:16 pm  · 
 · 
poop876

But aren't you limited to 104,000 s.f. for S2, sprinklered? 

Aug 13, 18 3:35 pm  · 
 · 
Stasis

I think you're looking at IIIB.  Also, I can't use 'S1' because it is multi leveled.


Aug 13, 18 3:49 pm  · 
 · 
poop876

I'm sorry, I thought it was 200k per story.

Aug 13, 18 4:00 pm  · 
 · 
Stasis

oh, i think i didn't make it clear.. 

The areas I provided are the total areas.  so, 106000 sf per floor.

Aug 13, 18 4:18 pm  · 
 · 

Block this user


Are you sure you want to block this user and hide all related comments throughout the site?

Archinect


This is your first comment on Archinect. Your comment will be visible once approved.

  • ×Search in: