Boston, MA
A $170 million vertical expansion of the existing central garage structure. The program included 3,000 additional parking spaces on three levels, new stair and elevator towers, new facades, and new pedestrian connections to terminal destinations via elevated walkway bridges.
A unique collaboration through a public art program resulted in an integrated structure, architecture, sound and colored light intervention at the two primary circulation towers, creating an unexpected traveling experience at the airport.
Construction Phase: Design Advisor, Fennick McCredie Architecture
Design Phase: Deborah Fennick, Principal Architect while with TAMS Architecture, Jonathan McCredie, Project Manager while with TAMS Architecture
Public Artist: Christopher Jenney
Photography: Peter Pereira
Status: Built
Location: Logan Airport