The interior design project was developed for the administrative building, part of a factory for the processing and assembly of insulating and porous materials. The building is two-storey, with an area of 770 m2.
Status: Built
Location: Plovdiv, BG
My Role: Interior design: offices, lobby, staircase, restrooms, sanitary facilities, canteen (2D drafting + 3D modeling)
Additional Credits: for Architechnicals;
ZEN Design ltd. (Architecture: Pre-Design + Project Establishment | Concept + Schematic Design | Design Development | Planning + Development Approval | Construction Documentation)