The architectural project for partial reconstruction (about 250 m2) in the existing administrative building of the factory covers one of the changing rooms and the old canteen, as well as a new canopy. The interior design is related to the conversion of the small factory canteen into a guest reception / small capacity event space (about 70 m2).
Status: Unbuilt
Location: Sevlievo, BG
My Role: Pre-Design + Project Establishment | Concept + Schematic Design | Design Development | Planning + Development Approval | Construction Documentation | Interior design (2D drafting + 3D modeling)
Additional Credits: for Architechnicals