W. Stockbridge sits on 18-acre land, overlooking the valley, South oriented. Surrounded within nature, the house remains within the privacy from neighbors and road. It is a 3-bedroom, 3-bathroom residence, including a living area, kitchen, dining area, media room, library, courtyard, and screened porch. Large openings, many of them floor to ceiling, allow a connection with the immediate outdoor. Budget of two million dollars (cost-plus). Basement is unconditioned. The building is sprinkled on both levels. The project embedded some aspects of sustainable design approach, like geothermal system for cooling and heating. I was involved with the design from the beginning of the project through to the final completion. I obtained a building permit once I had DD set compiled, as I was issuing bidding set to bidders. I reviewed the bids, answered bidders’ questions in the form of addenda and together with the owner decided on a GC for the project. It was a design bid build delivery method we used.
I coordinated engineer consultants, and oversaw CA phase, including reviewing applications for payments that the GC was submitting to me. I was involved with the design from the beginning of the project through to the final completion. I obtained a building permit once I had DD set compiled, as I was issuing bidding set to bidders. I reviewed the bids, answered bidders’ questions in the form of addenda and together with the owner decided on a GC for the project. It was a design bid build delivery method we used. I coordinated engineer consultants, and oversaw CA phase, including reviewing applications for payments that the GC was submitting to me. The exterior facade is cement board on pressure treated wood studs, fastened over zip wall. The project required ResCheck to be completed, as well as HERS ratings in compliance with the Stretch Code MASS Addendum to ICC. The consultants used the BIM model for coordination of services. The house consists of wood system, open web joists for floor and roof assemblies, and LVLs for vertical posts
I coordinated engineer consultants, and oversaw CA phase, including reviewing applications for payments that the GC was submitting to me. I was involved with the design from the beginning of the project through to the final completion. I obtained a building permit once I had DD set compiled, as I was issuing bidding set to bidders. I reviewed the bids, answered bidders’ questions in the form of addenda and together with the owner decided on a GC for the project. It was a design bid build delivery method we used. I coordinated engineer consultants, and oversaw CA phase, including reviewing applications for payments that the GC was submitting to me. The exterior facade is cement board on pressure treated wood studs, fastened over zip wall. The project required ResCheck to be completed, as well as HERS ratings in compliance with the Stretch Code MASS Addendum to ICC. The consultants used the BIM model for coordination of services. The house consists of wood system, open web joists for floor and roof assemblies, and LVLs for vertical posts
PROFESSIONAL SERVICE HIGHLIGHTS
Status: Built
Location: West Stockbridge, MA, US
Firm Role: Project Manager representing Architect's team, RES4A