Given the interest of the set and serving to the traditional, historical and environmental charactera, it arises the project, and therefore the intervention, from the utmost respect to the configuration, use and original appearance, directing all actions to remove, and replace if necessary, those elements which have been altered.
Thus, materials, techniques and construction methods considered are consistent with the design philosophy and pose, to the extent possible, recovery, healthy and replacement of damaged elements, in order to cause minimal impact
Status: Built
Location: Utiel, ES
My Role: Director Architect | Master Plan, Project, Construction Management.
Additional Credits: MD Villaescusa