The 2-story 25,000 s.f. school for children from pre-school thru high school was phase four of the church’s master campus plan. The upper and lower grades were located on separate levels each with a porte’cochere. The insulated precast panel structure has a total of 30 classrooms, 2 media center, 2 computer labs and 2 administrative office areas for the upper and lower schools.
Status: Built
Location: Bethlehem, GA, US
My Role: Project Architect/Manager