The main objective of the project was to work within an integrated design group, composed of an architect, structural engineer, system engineer, geotechnical engineer, and manager. I personally worked on the architectural redefinition of the project, while confronting the requirements of the different disciplines.
Status: School Project
Location: Copenhagen, DK