Archinect
Farah Jamil

Farah Jamil

Haslett, MI, US

anchor

Zorinsky Family Aquatic Center

Client:      City of Omaha Parks and Recreation
Building Area:
                 Bath House: 2,633 sq. ft.
                 Pump House: 1,135 sq. ft.
Project Cost: $3,400,000 (Bid Cost: $4,200,000)
Budget (Architectural & Structural): $662,542
Occupants: 400 persons

Responsibilities:
• Design Concept and floor plan options
• Graphic presentations using hand sketches and images from 3D Sketch-Up model
• Assisted in preparing production documents (SD, DD, CD)
• Worked on architectural details and selection of material
• Closely worked with Structural Engineer to coordinate architectural plans and figure out details
• Worked with Interior Designer in selection of material and colors
• Area take-off for cost estimate
• During construction phase, assisted with shop drawings as needed

Other Information
• Master Plan - August 2008
• Construction Document - March 2009
• Opening Date - June 5th, 2010

http://www.co.douglas.ne.us/omaha/parks/recreation/467

 
Read more

Status: Built
Location: Omaha, NE, US