Seneca Middle School (2020-2022)

The scope of work includes the Seneca Middle School Replacement set on property located to the east of the intersection of Jamesway Drive and Wells Highway in Seneca, SC. It is anticipated to be around 160,000 SF with an initial enrollment of 1,000 students but with the capacity to accommodate 1,200 students. The budget is $32,000,000. Client: School District of Oconee County.

 
Read more

Status: Under Construction
Location: Seneca, SC, US
My Role: Design Cafeteria, Main Lobby, VE caused by rocket increase of price during the pandemic, Construction Documents, Addenda & Revisions
Additional Credits: ASHLEY TANNEBAUM; JOEL M. CARTER; CYNTHIA METZ

 
Aerial Rendering
Aerial Rendering
Site Plan Credit: Ashley Tannebaum
Site Plan
Credit: Ashley Tannebaum
Floor Plan Credit: Ashley Tannebaum
Floor Plan
Credit: Ashley Tannebaum
Main Entrance Rendering-Zoom In
Main Entrance Rendering-Zoom In
Cafeteria Study-1
Cafeteria Study-1
Cafeteria Study-2
Cafeteria Study-2
Inclusive Bathroom Design Study - Hand Sketch
Inclusive Bathroom Design Study - Hand Sketch
Inclusive Bathroom Design - Principles & Strategies through Literature Review
Inclusive Bathroom Design - Principles & Strategies through Literature Review
Target Items
Target Items
Existing Conditions & Analysis
Existing Conditions & Analysis
Design Study - 1
Design Study - 1
Design Study - 2
Design Study - 2
Design Study - 3
Design Study - 3
Main Lobby Ceiling and Lighting Fixture Study - 1
Main Lobby Ceiling and Lighting Fixture Study - 1
Main Lobby Ceiling and Lighting Fixture Study - 2
Main Lobby Ceiling and Lighting Fixture Study - 2
Main Lobby Ceiling and Lighting Fixture Study - 3
Main Lobby Ceiling and Lighting Fixture Study - 3