Archinect
LANDÍNEZ+REY architects [eL2Gaa]

LANDÍNEZ+REY architects [eL2Gaa]

Madrid, ES

anchor
Locker room volume - skylights in front of indoor court
Locker room volume - skylights in front of indoor court
6 more images  ↓

GYM PAVILION IN MALPARTIDA DE PLASENCIA, CÁCERES (SPAIN)

Enabling the improvement of the existing "Quercus" State Secondary School facilities, the scheme organizes the exterior area of the School, providing play spaces and a new gym pavilion.

Located at the highest level of the north border of the town of Malpartida de Plasencia (Cáceres, Spain)  the site has is a significant level change of 17 m across it.

LANDSCAPING. The brief includes a new vehicular access from the Town Center as well as a new external playground area and a 22 x 44m sport court.

The aim has been to create a high quality landscape by enabling better connections between the town, the existing school building and the new gym pavilion, making the area more pleasant and accessible for the students.

The design creates a geometrical layout of in situ concrete retaining walls and platforms at different levels, from the access at the lower level, to the upper platform where the gym pavilion and its connection with the existing school entrance is located.

GYM PAVILION. According to the different scale of uses within the building, the design responds with an specific construction system.

On the one hand, the small ancillary areas comprising changing rooms, storage and the instructor office, are included inside dark brick one storey volumes, enclosed by a concrete frame. Located in front of the existing building, the entrance to the facilities is defined in between two of these volumes. By using skylights in this area, the natural lighting and privacy is ensured.

On the other hand, the interior court area is conceived as a prismatic white precast concrete abstract volume. It is located beside the exterior sports court, with a direct connection between both. In this case, the internal courtyard provides indirect natural light avoiding glare.

ARCHITECTS:

david LANDÍNEZ GONZÁLEZ-VALCÁRCEL +

MÓNICA GONZÁLEZ REY 

(LANDÍNEZ+REY | equipo L2G arquitectos, slp [eL2Gaa] )

+

ROCIO LANDÍNEZ GONZÁLEZ-VALCÁRCEL


 
Read more

Status: Built
Location: Malpartida de Plasencia, ES
Firm Role: architect
Additional Credits: ARCHITECTS:
david LANDÍNEZ GONZÁLEZ-VALCÁRCEL
mónica GONZÁLEZ REY
(LANDÍNEZ+REY | equipo L2G arquitectos, slp [eL2Gaa] )
+
rocío LANDÍNEZ GONZÁLEZ-VALCÁRCEL

PHOTOGRAPHS: JESÚS GRANADA, architectural photographer
PROJECT COLLABORATORS:
belén DIÁZ-VIEITO PIÉLAGOS
antonio RODRÍGUEZ GONZÁLEZ
ester BELLÓN OLMEDO
paula JAÉN CAPARRÓS

QUANTITY SURVEYOR: ana belén CORBACHO BARQUERO, a.técnico – JEX
PROMOTER: Consejería de Educación – Gobierno de Extremadura
MAIN CONTRACTOR: Construcciones José y Margarita, S.L.

 
Indoor sports track
Indoor sports track
Access to indoor sports court and outdoor sports courts
Access to indoor sports court and outdoor sports courts
Indoor sports track - Courtyards of light
Indoor sports track - Courtyards of light
Access to indoor sports court
Access to indoor sports court
Outdoor sports courts
Outdoor sports courts
Access to indoor sports court from outdoor sports court
Access to indoor sports court from outdoor sports court