Archinect
Kerem Masaracı

Kerem Masaracı

Düsseldorf, DE

anchor
MEC Hall view towards the entrance
MEC Hall view towards the entrance
4 more images  ↓

Manchester Engineering Campus Development (MECD)

Program 81,000 m2 campus development with central MEC Hall (59,000 m2), including state-of-the-art student spaces, teaching environments, lecture halls, laser labs (1161 m2), dry labs (8784 m2), chemical labs (2412 m2), biological labs (630 m2), characterization labs (1141 m2), workshops, cleanrooms, meeting rooms, conference, food and beverage, equipment/material storage and associated public realm Client University of Manchester, UK Design 2014-2016 Realization 2017-2019

 

Pictures © Mecanoo

 
Read more

Status: Under Construction
Location: Manchester, GB
My Role: Intermediate Architect
Additional Credits: Mecanoo Architecten

 
Birdseye view
Birdseye view
Mec Hall will be the central element of the campus
Mec Hall will be the central element of the campus
Scheme
Scheme
Technical workshops
Technical workshops