This was a second year project that was designed to create an environment that was completely formed and shaped by the removal of bricks, within the large brick itself. This project, unanimously, for the first time in the schools history, won the brick build at NJSOA (The only academic competition, which took place at the end of second year)
It was a three part competition, that represented one building designed by each studio out of the total of 13 studios. There was the competition board, a presentation, and the mock up. All of which judged by a jury of guest architects.
The mock up, was an abstraction of the most important characteristics of the larger building.
Status: School Project
My Role: The designer of the mock-up / Responsible for the all renderings of the final project.