CAMP VERDE PUBLIC LIBRARY. -- Camp Verde, AZ. New 2-story public library. Responsible for all aspects of design
(Programming, Conceptual design, Entitlement, design development, code analysis/ code review, permit set, construction documents and construction administration). Coordination with consultants (MEP, Civil, Structural Engineers). Project Scope: Approx. $4 million Building Area: 17,000 sq. ft.
Status: Built
Location: Camp Verde, AZ, US
My Role: Project Architect
Additional Credits: Client: Town of Camp Verde
General Contractor: Woodruff Construction
Design Team Credits
Structural Engineer – John Thompson, PE
Mechanical Engineer – Michael Willis PE, Willis Engineering
Electrical Engineer – William Bethurum PE, Volta, US
Civil Engineer- Joseph Link PE, Shephard Wesnitzer Inc.
Steel Building Designer—Bunger Steel (initial); Nucor (final)
LEED consultant—John Neville LEED AP
Acoustical Engineer-- Daniel C. Bruck, Ph.D., BRC Acoustics & Audiovisual Design