Archinect
Dexter Foster II

Dexter Foster II

Los Angeles, CA, US

 
View Portfolio

About 

Dexter holds 5+ years of experience in commercial, business, and residential projects at a variety of scales. He develops documents from schematic through construction administration and plays a key role in ensuring clients have a visual comprehension of their space throughout the design process. Prioritizing team relations and client needs is how he sets the stage for delivering an

Organized and successful project through to completion. Alternatively, he enjoys conceptualizing his ideas through 3d modeling and rendering- no matter it’s practicality. His background in fine has developed his aesthetic sensibility, and has added a practice of “framing space”. He feels this is the key to his process of designing.


Elsewhere:

Employment 

STUDIOS Architecture, Los Angeles, CA, US, Coordinator/ Job Captain

As a project coordinator I ensure organization of project details and correspondence between all disciplines and parties. I order and collect material samples, design attachment/ connection details and render conceptualization images using 3D/ 2D software.
Project Coordination also involves setting up re-occuring meetings for project progress and oversight for the entire team. As well as handle the records of meeting minutes and distribution of tasks. All to ensure an on-time deliverable.

Apr 2022 - current
 

Design2Form, Hollywood, FL, US, Intern Architect

I work individually and as part of the design team developing creative design concepts for various project scales. Coordinating between clients, subcontractors, and all parties involved in Design Development all the way through 100% Construction Documents. Under general supervision, I am involved in the preparation and presentation of material to the client. Lastly, I assist with the estimation of material requirements and costs.

Apr 2018 - current
 

STUDIO +, Fort Myers, FL, US, Junior Project Coordinator

As a project coordinator, I collaborate with my team to deliver quality design and deliverables through all aspects of the project. Through sketching, Revit, and other design software, I contribute to design conceptualization- all the way to construction documents and administration.
Project experience ranges in scale and includes Healthcare, Business, and Residential.

Aug 2019 - Apr 2022
 

Turner Construction/ Foster Construction, Miami, FL, US, Pre-Con Estimator

Contracted as an estimator for the Pre-Con phase of a new Rehabilitation Center at Miami Jackson Memorial Hospital. I worked in a small team to put together bid packages and organize outreach events to inform SBE contractors and get them experience on such a large scale project. I reviewed Construction Documents, bids, qualified specs and conducted take- offs- all using Blue Beam Revu, On Screen Take Off and Microsoft Excel.

Aug 2017 - Apr 2018
 

Design2Form, Hollywood, FL, US, Summer Architectural Intern

Led Design schemes on four projects, and prepared presentation material including renderings and material boards.

May 2016 - Aug 2016
 

Education 

Rhode Island School of Design (RISD), Providence, RI, US, BArch, Architecture

Sep 2012 - Jun 2017
 

Areas of Specialization 

Skills