Texas Dept of Transportation, Austin, TX, US, Architect III

1. Prepared Public Bid Estimate Support for:
1-a.$20 mil counter estimate, as opposed to assigned $9 million for the new Brenham TxDOT Administrative/Laboratory, Vehicle Maintenance and related support facilities(Vehicle Wash, Heavy Equipment Storages Canopies). $20 mil estimate was later supported by vendor estimate ten weeks later.
1-b.$96k Port Arthur guards hack. Actual bid range: $87,000 – $105,000
1-c.$116k Shower Additions and Restroom Renovations at existing facility. Program Director supported the $160k estimate support and rejected a lower prior engineering estimate of $95k

2.Reviewed Consultant Submittals (Plans, Spec, and Estimate):
Project types and location:
2-a:TxDOT Area Office/Laboratory Maintenance Shops Replacement at Brenham, Marlin, Sealy, Pompa, and Electra.
Office building renovation at Van Horn

3. Performed Architectural Construction Documentations Services in Revit and Public Bid Budget Estimate for the Construction Expense:
Locations, and square feet of work:
3-a:Port Aransas Guard Shack,-less than 500 square feet,
3-b:Jasper AEM- add shower stalls in existing restrooms-less than 1000
square feet
3-c:Athens AEM: retrofit existing exterior wall assemblies-10,000 square feet)

4.Provided patent recommendation, Aerosol Sealant, and Oak Ridge National
Laboratory (ORNL) recommendation, fasten gyp board over existing exterior wall assembly, for sealing existing 1990’s building envelope moisture infiltration problem at TxDOT facility and for supporting TxDOT Program Director decision to provide plenum return in an retrofit enclosed attic space.

5.Performed AE/MEP concept review with ASTM’s for resolution to on how to add a
shower to a 1960’s office building, while the building consists of a non-compliance condition: air movement in existing fire exit access corridors.

6.Performed Project Management functions through standardization of process
through Autodesk BIM360 features such as issues log, audit log, review
template, and transmittals.

7. Created report to account for pay check accountability by the minutes and
associated assignments.

8. Negotiated AE Consultant Contract services for assigned design and construction
budget
8-a:Project: renovation of headquarter building at Waco
Schedule: an expedited, reduced schedule of delivery
Activities performed to expedite schedule: performed programming and
schematic design in house with other team members.
Design Budget: $500k. Negotiated contracted budget: $287k
Scope of Contracted Services: Hazardous Asbestos Survey, Design
Development, Construction Documentation, Construction
Administration.

9.Performed supervision and control of construction documents performed by non-registrants.
Type of Work, and associated square feet:
9-a:New Heavy Maintenance Repair Shop, under 5,000 S.F.
9-b:New Shower Addition in Existing Office Building. Under 200 S.F.

10.Performed budget estimate and construction documentation for life safety compliance to State Fire Marshall Citation: Provide functional sprinkler building with flammable/combustible storage at Athens Regional Warehouse to comply with maximum 200 feet travel distance to exit per NFPA.
Area: 75,000 Square Feet
Current Construction Type: Type I/II
Sprinklers: Installed since 2001 but not functional due to lack of water
pressure
Scope of Work: Additional Exits, Occupancy Separations, New Control Room
Building.
Provided Construction And AE Fee Estimate for Scope: $500,000
Method: Newtonian Physics, RS Means
Drawings: Revit in TXDOT templates

11.Performed budget estimate and construction documentation services for life safety compliance at Beaumont District Warehouse:
Area: 50,000 Square Feet divided into four fire barrier areas
Current Construction Type: Type I/II
Sprinklers: None
Provided Construction Fee, for AE estimate is not applicable as it’s done in house.
Drawing: Revit in TXDOT template

Jan 2023 - current
 

arte-architecture, Stafford, TX, US, contract for hire: architect

performed construction documentation according to Texas Board of Architectural Examiner rules.

Nov 2021 - Dec 2021
 

city of Houston: solid waste mgmt, Houston, project manager

1.Provided justification to Public Improvement Projects and Fleet Investments

2.Compliance to Environmental Related Tasks

3.Annual Fixed Asset Insurance Schedule Review

4.Landfill/Transfer Station Contract Monitoring

5.Financial Statement Analysis and RFP Preparation

6.Federal Disaster Grants (Harvey, CARES) Application,

7.Business Analyst

8.Ruby On Rails App Developer

9.Six Sigma Audit

10.Interim Chief of Staff

Dec 2009 - Aug 2021
 

City of Houston General Services Dept, Houston, TX, US, Sr Project Manager

. Participated in design and construction project monthly meetings

2. Negotiated fees with selected AE firms for Indefinite Task Order Contracts and Architectural Services contract.

3. Suggested selection criteria during preparation of Request For Proposal or Qualification selection process of Architects/Engineering, Construction Manager At Risk firms

4. Prepared Capital Improvement Program overall project schedule and suggested methods of design and construction contract delivery.

5. Recommended course of action to maintain schedule and budget.

6. Weekly prepared and reviewed overall schedule of projects, and report incidents.

7. Prepared constructability review during construction document preparation

8. Prepared City’s standard divisions zero and division one specification prior to proposal or bid by

Contractor.

9. Processed Architect/Engineer and Construction pay request

10. Processed, prepared, and answered questions related to Request For Council Actions.

11. Reviewed construction change orders, work change directives.

12. Reviewed Request for Information, bid drawings, specification, prepared addenda, and riders.

13. Maintained positive professional relationships with client departments which included Public Works and Engineering, and Solid Waste.

14. Created criteria of exhibits in programming and design contract.

15. Reviewed, acknowledged, and complied with City Engineer’s in-house procedures.

16. Prepared construction work estimate using R.S. Means and verified construction cost estimates from Job Order Contractor.

17. Prepared, negotiated and developed architectural programming contract’s list of services.

18. Suggested standards format of information for architectural work products.

Feb 2006 - Dec 2009
 

Prozign Architect, Houston, TX, US, Architect

Duties:
1. Produced and coordinated design process between all consultants from schematic to construction documentation services.
Projects include:
● $27 million Stephen F Austin University expansion, Nacogdoches, TX
● $2 million retail development at 701 Shepherd. Signed and Sealed Construction Documentation
● $14.5 million Renovation of Central Library, Julia Ideson Library, and 820 Marston building.
a. I Signed and Sealed Construction Documentation as Registered Architect of Texas

Aug 2004 - Feb 2006
 

Goree Architect, Bellaire, TX, US, Architect

1. Produced and coordinated design process between all consultants from schematic to construction documentation services
2. Assigned daily work assignment to team members
3. Coordinated related disciplines and trades
4. Performed Quality Review & complete document checks using in-house checklist and procedures.
5. Assigned project production schedule using Microsoft Project
6. Implemented in-house CAD standard.
7. Reviewed service agreement with clients.
8. Monitored & reported on project business plans and management plan.
9. Performed construction administration services.
10. Projects included:
● Russell & Smith Ford New Showroom, Houston TX
Cost of construction: $2.62 Million.
*Design & Built Venture with Wier Enterprises.*
● Clear Lake Infiniti New Showroom, Clear Lake, TX
Cost of construction: $2.5 Million.
*Design & Built Venture with Wier Enterprises*
● Classic Toyota addition and remodeling, Round Rock TX
Cost of construction: $2.4 million
● Lexus of Shreveport, Shreveport, LA
New showroom and service shop 30,000 s.f.
Cost of construction budgeted: $2.5 million
● Central Ford, Manvel, TX
New showroom and body shop: 57,000 s.f.
Cost of construction budgeted: $4.5 million

Nov 2001 - Aug 2004
 

Education 

Southern New Hampshire University, Manchester, NH, US, Masters, Finance

concentration on investment

Sep 2013 - Jun 2020
 

Texas A&M Commerce, Commerce, Masters, Business Administration

Executive MBA

Mar 2011 - Aug 2013
 

Texas A&M University, College Station, TX, US, Bachelors, environmental design

Sep 1987 - Dec 1991
 

Areas of Specialization