Archinect
contemporary architecture of Iran

contemporary architecture of Iran

Tehran, IR

anchor

Sport Complex For Disables, Tehran, Iran

PROJECT GENERAL INFORMATION

 

Name : Sport Complex For Disables 

Architects: Experimental Branch of Architecture

Architect In Charge: Arash Mozafari

Location: Tehran, Iran

Design Team : Aqil Bahra, Babak Rashedi, Amir Ahmadi Zonouz, Farzad Giyasi, Maryam

Yeganeh,Atiyeh Aghaei, Ronak Namdari, Hamid Mahmoodpour, Neda Lotfi , Lida Ghodrat Nezhad,

Samaneh Rezvani, Javad Hadavandi, Lida Mahmoodpour

Supervision Team : Siavash Gobraei, Ariya Daneshvar, Mohammad Ghiyasi, Ali Asghar Shabrang, Hassan Saedi Rad, Ammar Alikhah, Nima Chegini, Mohammad Faraji

Project Manager : Ashkan Sedigh

Mechanical Engineering : Arkan Arzesh Company. En.Ghodousi Zadeh

Electrical Engineering : Rastak Pouya Company. En.Rahmati

Civil Engineer : En. Khosroo Hariri

Construction: Sang Bon Bana Co. En.Nourouzi

Client : Development of Cultural Environment Co.

Completion: 2011

Area : 18,000 sqm

Building Type : Sport Complex

3D Modeling : Milad Golmohammadi, Majid Zamani

Model : Saeid Ghadyani

Photographs : Courtesy of Experimental Branch of Architecture | Soroush Gobraei, Kiyarash Kiaei

 

More than 3 million disabled of natural disasters, accidents and Iran-Iraq war are living in Iran. They are so vulnerable and forgotten due to the lack of urban facilities and other special services. In 2007, Cultural-Social Administration of Tehran municipality, decided to construct a cultural-sport complex for disabled in each 22 Tehran districts, in order to increase these kinds of facilities. Thus, one physical program was prepared by initiatory consultant and was advised to all districts to have a same program for all of these complexes.

The proposed site was part of a 50×100 land and just 30×100 occupation was possible. The remained area belonged to the municipality which should prepare the access to the northern part of the site. Furthermore, the municipality defined this part as public green space, separated from Cultural-Sport site. An obsolete curriery factory was located in the southern part of the site with 100 year old trees and very appropriate green space.

After mechanical test it was revealed that just 2 levels can be built underground. We got the permission of locating parking sunder the public park. The site area was so limited for all of the client’s program and demands, and city managers insisted on producing this kind of space in mentioned site. So a tall building was inevitable and finally the program turns into functional boxes. These functional boxes locate and slip over each other to make voids between spaces. Thespaces which behave in relation to inside and outside of the building.

Some ramps in the northern façade, connect these functional boxes together, and define special wheelchair paths that make a dynamic façade, as well. These ramps are located in a façade box opposite to interior functions. A functional façade box which is the project façade and connect different parts as well. A façade which is always changing due to its users and users are a part of architectural project. These ramps finally reach to the roof which a wheelchair Track is located on it.

 

Cultural-sport complex for disabled contains these spaces: administrative sector, cultural sector contains of library, gallery, Amphitheater, media center. Educational sector contains of conference hall, training classes and workshops. Sport sector contains of pool, Steam Sauna, Hydrotherapy Pool, Table Tennis Hall, Gym, Fitness, Shooting Hall, Multipurpose Hall, Chess Room, wheelchair path. Service contains of Buffet, Public hall, place of worship, parking, utility and circulation.    

http://www.caoi.ir/index.php/en/projects/item/371-sport-complex-for-disabled

 
Read more

Status: Built
Location: Tehran, IR