Archinect

A New Norris House: Phase IV

Live-In Evaluation and Monitoring of a design/build effort

  • Rainwater System and LEED Certification

    By newnorrishouse
    Jan 9, '12 12:53 PM EST

    Here is a link to an article published last month in PHC News. The article focuses on the rainwater harvesting system at the New Norris House. Credits have been earned in all LEED for Homes categories and we expect to earn 12 out of 15 credits in the Water Efficiency (WE) Category. 4 of these... View full entry


    Tagged

    rainwaterleed

  • USGBC Tour

    By newnorrishouse
    Oct 26, '11 3:59 PM EST

    Before talking about the latest New Norris House happenings, I should introduce myself. My name is Eric Bennett, one of the Graduate Research Assistants for the New Norris House. I am currently in my final year of the Master of Architecture program at UTK. I received my undergraduate degree in... View full entry



  • ×Search in:
 

About this Blog

The New Norris House is a design/build effort from the University of Tennessee's College of Architecture and Design. Began in 2009, the home was designed and built by UT students in collaboration with Clayton Homes. The built project is now complete and the final phase of the project has begun. A team of 4 people (2 living in the home, and 2 graduate researchers) will rigorously document the experience via qualitative assessments and quantitative measurements, posting results to this blog.

Affiliated with:

Authored by:

Other blogs from the same authors:

Other blogs affiliated with The University of Tennessee - Knoxville:

Recent Entries