In this project, I had to design a public toilet structure housing 8 toilets and 8 sinks. Plumbing is the only mechanical system and the structure should address light and ventilation. The maximum total area 700sf. I needed to consider the topography of the site, and the many user groups that pass through the site (joggers, dog walkers, playground, and urban pedestrian).
Status: School Project
Location: New York, NY, US
My Role: Designer