Jr. Architect for the planning and design of the Terminal 2 West Building and Airside Expansion Project. The terminal expansion will consist of 430,000-SF of new public and non-public areas, providing 10 additional contact aircraft gates, while the airside pavement expansion will incorporate an area of 1.5 million-SF including aircraft parking, aprons, taxiways and taxi lanes. This project is being delivered using the design-build delivery method.
Status: Under Construction
Location: San Diego, California
My Role: Jr. Architect
Additional Credits: HNTB Architecture Inc.