UPA was appointed by the UAE Ministry of Education for a design consultancy service of the secondary school (cycle 3) in the Northern Emirates.

The concept was developed in Join Venture with General Planning in Milan. This was afterwards carried out by UPA Abu Dhabi and UPA Italia in Milano, offering a complete Architectural / Engineering Consultancy Service, including Tender Documentation.

During the construction of the School in the Emirates of the Shariah, the client had evaluated many positive aspects of the proposed design and considered it as very successful project. For this reason it was decided to keep the project as a prototype to be developed in three different areas.

Client: UAE Ministry of Education

Location: Sharjah, Fujairah, Rak (UAE)

Plot Area: 10,000

Built Up Area: 500 smq for units, total 4

Estimation: 4 million € for 4 units

UPA Role: Design Consultancy Services

Project Duration: Design 8 months

 
Read more

Status: Built
Location: Dubai, AE
Additional Credits: UPA was appointed by the UAE Ministry of Education for a design consultancy service of the secondary school (cycle 3) in the Northern Emirates.

The concept was developed in Join Venture with General Planning in Milan. This was afterwards carried out by UPA Abu Dhabi and UPA Italia in Milano, offering a complete Architectural / Engineering Consultancy Service, including Tender Documentation.

During the construction of the School in the Emirates of the Shariah, the client had evaluated many positive aspects of the proposed design and considered it as very successful project. For this reason it was decided to keep the project as a prototype to be developed in three different areas.





Client: UAE Ministry of Education

Location: Sharjah, Fujairah, Rak (UAE)

Plot Area: 10,000

Built Up Area: 500 smq for units, total 4

Estimation: 4 million € for 4 units

UPA Role: Design Consultancy Services

Project Duration: Design 8 months