Project Manager/ April 2019
Coordinator of the construction USD 5.5M- 1200 sqm, 45 hospital beds
Successfully finished with teams the building project within a time-restricted schedule in order to expand capacity system-wide of the hospital.
In charge and responsible for the entire Covid Temporary Hospital construction and operation exclusively for covid patients who need oxygen therapy and immediate care
Coordination of architectural design with construction, electrical, and HVAC engineers. / Design drawings for client review.
Liaison with local authorities regarding work permits and approvals
Control of construction progress on the building site Time-Lapse Temporary COVID-19 Hospital. Monterrey,
Status: Built
Location: Monterrey, MX
My Role: Project Manager
Additional Credits: PRODEI Healthcare design and construction